| 123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990919293949596979899100101102103104105106107108109110111112113114115116117118119120121122123124125126127128129130131132133134135136137138139140141142143144145146147148149150151152153154155156157158159160161162163164165166167168169170171172173174175176177178179180181182183184185186187188189190191192193194195196197198199200201202203204205206207208209210211212213214215216217218219220221222223224225226227228229230231232233234235236237238239240241242243244245246247248249250251252253254255256257258259260261262263264265266267268269270271272273274275276277278279280281282283284285286287288289290291292293294295296297298299300301302303304305 |
- # generated: 2026-01-12
- # project: 188-179-template-6
- # project_key: 188-179-template-6
- # tracking_system: file-system
- # story_location: _bmad-output/implementation-artifacts
- # STATUS DEFINITIONS:
- # ==================
- # Epic Status:
- # - backlog: Epic not yet started
- # - in-progress: Epic actively being worked on
- # - done: All stories in epic completed
- #
- # Epic Status Transitions:
- # - backlog -> in-progress: Automatically when first story is created (via create-story)
- # - in-progress -> done: Manually when all stories reach 'done' status
- #
- # Story Status:
- # - backlog: Story only exists in epic file
- # - ready-for-dev: Story file created in stories folder
- # - in-progress: Developer actively working on implementation
- # - review: Ready for code review (via Dev's code-review workflow)
- # - done: Story completed
- #
- # Retrospective Status:
- # - optional: Can be completed but not required
- # - done: Retrospective has been completed
- #
- # WORKFLOW NOTES:
- # ===============
- # - Epic transitions to 'in-progress' automatically when first story is created
- # - Stories can be worked in parallel if team capacity allows
- # - SM typically creates next story after previous one is 'done' to incorporate learnings
- # - Dev moves story to 'review', then runs code-review (fresh context, different LLM recommended)
- generated: 2026-01-13T12:00:00Z
- project: 188-179-template-6
- project_key: 188-179-template-6
- tracking_system: file-system
- story_location: _bmad-output/implementation-artifacts
- development_status:
- # Epic 1: 测试工具包基础框架与 Select 支持
- epic-1: done
- 1-1-create-package-structure: done
- 1-2-implement-types-errors: done
- 1-3-static-select-tool: done
- 1-4-async-select-tool: done
- 1-5-main-export-docs: done
- 1-6-select-unit-tests: done
- epic-1-retrospective: done
- # Epic 2: 在现有 E2E 测试中验证 Select 工具
- # 详情参见: _bmad-output/implementation-artifacts/epic-2-retrospective.md
- epic-2: done
- 2-1-install-e2e-utils: done
- 2-2-rewrite-static-select: done
- 2-3-rewrite-async-select: done
- 2-4-run-tests-collect-feedback: done
- 2-5-fix-found-issues: done
- 2-6-stability-validation: done
- epic-2-retrospective: done
- # Epic 3: 文件上传工具开发与验证
- # 目标: 遵循"先验证再扩展"策略,优先开发文件上传工具,解决当前测试超时阻塞问题
- # 模式: 工具开发 → 真实 E2E 测试验证 → 问题修复 → 稳定性验证
- # 回顾文档: _bmad-output/implementation-artifacts/epic-3-retrospective.md
- epic-3: done
- 3-1-file-upload-tool: done # 开发文件上传工具函数(含 UI 组件架构改进)
- 3-2-upload-unit-tests: done # 编写文件上传工具的单元测试
- 3-3-upload-e2e-integration: done # 在 web/tests/e2e 中验证文件上传工具
- 3-4-collect-feedback-fix: done # 收集反馈并修复问题(修复了 Select 工具处理带 * 标签的问题)
- 3-5-multiple-file-upload: done # 支持多文件同时上传
- 3-6-upload-stability-test: done # 文件上传稳定性验证 (6次连续运行 100% 通过)
- epic-3-retrospective: done # 回顾完成于 2026-01-11
- # Epic 4: 表单工具开发与验证
- # ⏭️ 已跳过 - 2026-01-16
- # 跳过原因:
- # - 现有工具(Select、文件上传)+ Playwright API + Page Object 模式已完全满足表单测试需求
- # - Playwright MCP 提供了手动测试表单的能力
- # - Story 10.12 评估结论:表单工具是"可选优化",非必需
- # - 多个业务 Epic(8、9、10、11-13)已证明当前方案可行
- # - scrollToSection() 已在 Page Object 中实现
- epic-4: done
- 4-1-form-helper-tool: n/a # 开发表单辅助工具函数 - 已跳过
- 4-2-form-unit-tests: n/a # 编写表单工具的单元测试 - 已跳过
- 4-3-form-e2e-integration: n/a # 在 web/tests/e2e 中验证表单工具 - 已跳过
- 4-4-form-stability-test: n/a # 表单稳定性验证 - 已跳过
- epic-4-retrospective: n/a # Epic 已跳过,无需回顾
- # Epic 5: 列表和对话框工具开发与验证
- # ⏭️ 已跳过 - 2026-01-16
- # 跳过原因:
- # - 现有 Page Object 模式已完全实现列表操作(addBankCard, deleteBankCard, addVisit, deleteVisit, addNote, deleteNote 等)
- # - 对话框操作已在多个 Page Object 中实现(waitForDialogClosed, cancelDialog, confirmDelete 等)
- # - Playwright MCP 提供了手动测试能力
- # - Epic 8-13(6 个业务 Epic)已证明当前方案可行
- # - Story 10.12 评估模式:工具扩展需求少于 3 个,表单工具被评估为"可选优化"
- # - 列表和对话框工具比表单工具更特定于业务场景,通用性更低
- epic-5: done
- 5-1-dynamic-list-dialog-tool: n/a # 开发动态列表和对话框工具函数 - 已跳过
- 5-2-list-dialog-unit-tests: n/a # 编写列表和对话框的单元测试 - 已跳过
- 5-3-list-dialog-e2e-integration: n/a # 在 web/tests/e2e 中验证 - 已跳过
- 5-4-list-dialog-stability-test: n/a # 稳定性验证 - 已跳过
- epic-5-retrospective: n/a # Epic 已跳过,无需回顾
- # Epic 6: 完整验证(残疾人管理)
- # ⏭️ 已跳过 - 2026-01-16
- # 跳过原因:
- # - Epic 9(残疾人管理完整 E2E 测试覆盖)已完成所有验证目标
- # - Epic 9 包含:照片上传(9.1)、银行卡(9.2)、备注(9.3)、回访(9.4)、CRUD(9.5)、并行隔离(9.6)、稳定性验证(9.7)
- # - Epic 9 回顾完成于 2026-01-12,通过率从 77.4% 提升到 90.3%
- # - 业务 Epic 8-13 已充分证明工具包可靠性
- epic-6: done
- 6-1-complete-flow-test: n/a # 完整流程测试 - 已合并到 Epic 9
- 6-2-stability-test: n/a # 稳定性测试 - 已合并到 Epic 9
- epic-6-retrospective: n/a # Epic 已跳过,无需回顾
- # Epic 7: 完善文档与开发者体验
- # ⏭️ 已跳过 - 2026-01-16
- # 跳过原因:
- # - README.md 已完善(568 行),包含安装、快速入门、完整 API 文档、使用示例
- # - DEVELOPER_CHECKLIST.md 已存在(开发者自查清单)
- # - 业务 Epic 8-13 已证明当前文档足够支持开发
- # - VS Code Snippets 非必需(工具扩展需求少于 3 个)
- # - JSDoc 已提供完整的 IDE 类型提示支持
- epic-7: done
- 7-1-improve-readme-docs: n/a # 当前文档已满足需求 - 已跳过
- 7-2-vscode-snippets: n/a # 非必需,可后续添加 - 已跳过
- epic-7-retrospective: n/a # Epic 已跳过,无需回顾
- # Epic 8: 区域管理 E2E 测试 (Epic B - 业务测试 Epic)
- # 目标: 测试开发者可以为区域管理功能编写完整的 E2E 测试
- # 业务分组: Epic B(业务测试 Epic)
- # 范围: 省/市/区/街道的添加、编辑、删除和级联选择功能
- # 依赖: Epic 9 完成(确保测试隔离和并行执行策略已验证)
- epic-8: done
- 8-1-region-page-object: done # 创建区域管理 Page Object
- 8-2-region-list-test: done # 编写区域列表查看测试(代码审查已完成)
- 8-3-add-region-test: done # 编写添加区域测试 (15/15 tests passed,代码审查完成)
- 8-4-edit-region-test: done # 编写编辑区域测试(10个测试通过,2个跳过:子区域编辑需要修复createChildRegion功能)
- 8-5-delete-region-test: done # 编写删除区域测试(15个测试全部通过,代码审查完成,所有HIGH和MEDIUM问题已修复)
- 8-6-cascade-select-test: done # 编写级联选择完整流程测试 (代码审查完成,所有HIGH和MEDIUM问题已修复)
- 8-7-run-tests-collect-issues: done # 运行测试并收集问题和改进建议 - 代码审查完成,所有CRITICAL和MEDIUM问题已修复
- 8-8-extend-utils-if-needed: n/a # 扩展工具包(如需要)⏭️ 已跳过 - Story 8-7 评估确认不需要扩展工具包,问题都是测试代码或业务代码问题
- 8-9-region-stability-test: done # 区域管理稳定性验证 ✅ 组件自动展开功能已实现并验证 (2026-01-12)
- epic-8-retrospective: optional
- # Epic 9: 残疾人管理完整 E2E 测试覆盖(含并行隔离)
- # 目标: 为残疾人管理功能编写完整的、真正验证业务功能的 E2E 测试
- # 背景: 现有测试只是组件验证,需要补充完整的业务功能测试
- # 模式: 业务测试优先,工具按需扩展(遵循新 PRD 方向)
- # 优先级: HIGH - 阻塞 Epic B(区域管理测试)
- # 详情参见: _bmad-output/implementation-artifacts/epic-9-plan.md
- epic-9: done
- 9-1-photo-upload-tests: done # 照片上传功能完整测试(所有8个测试通过)
- 9-2-bankcard-tests: done # 银行卡管理功能测试(添加、编辑、删除)
- 9-3-note-tests: done # 备注管理功能测试(添加、修改、删除)- 代码审查完成,所有HIGH和MEDIUM问题已修复
- 9-4-visit-tests: done # 回访记录管理测试(创建、查看、编辑)- 代码审查完成
- 9-5-crud-tests: done # 完整流程测试(新增、编辑、删除、查看)- 代码审查完成,所有HIGH和MEDIUM问题已修复
- 9-6-parallel-isolation: done # 测试隔离与并行执行验证 - 所有测试已移除 serial,支持并行执行,速度提升 3 倍
- 9-7-stability-validation: done # 稳定性验证 - 通过率从 77.4% 提升到 90.3%,核心 CRUD 功能全部通过
- epic-9-retrospective: done # 回顾完成于 2026-01-12,文档: epic-9-retrospective-2026-01-12.md
- # Epic 10: 订单管理 E2E 测试 (Epic C - 业务测试 Epic)
- # 目标: 测试开发者可以为订单管理功能编写完整的 E2E 测试
- # 业务分组: Epic C(业务测试 Epic)
- # 范围: 订单 CRUD、状态流转、人员关联、附件管理功能
- # 背景: 订单管理是招聘系统的核心业务功能,涉及复杂表单、状态流转、人员关联等场景
- # 依赖: Epic 1 和 Epic 2 完成(Select 工具基础)
- # 详情参见: _bmad-output/planning-artifacts/epics.md (Epic 10)
- # 回顾文档: _bmad-output/implementation-artifacts/epic-10-retrospective-2026-01-13.md
- epic-10: done
- 10-1-order-page-object: done # 创建订单管理 Page Object
- 10-2-order-list-tests: done # 编写订单列表查看测试(代码审查完成,所有HIGH和MEDIUM问题已修复)
- 10-3-order-filter-tests: done # 编写订单搜索和筛选测试(代码审查完成,所有HIGH和MEDIUM问题已修复)
- 10-4-order-create-tests: done # 编写创建订单测试
- 10-5-order-edit-tests: done # 编写编辑订单测试(代码审查完成,所有HIGH和MEDIUM问题已修复)
- 10-6-order-delete-tests: done # 编写删除订单测试 - 代码审查完成,所有HIGH和MEDIUM问题已修复
- 10-7-order-status-tests: done # 编写订单状态流转测试 - 代码审查完成,所有HIGH和MEDIUM问题已修复
- 10-8-order-detail-tests: done # 编写订单详情查看测试 - ✅ 13/13 测试通过 (2026-01-13)
- 10-9-order-person-tests: done # 编写人员关联功能测试 - 2026-01-13 完成:6/6 测试通过,代码审查完成
- 10-10-order-attachment-tests: done # 编写附件管理测试 - ✅ 完成 (2026-01-13) 代码审查完成,所有问题已修复
- 10-11-order-complete-tests: done # 编写订单完整流程测试 ✅ 2/2 测试通过,所有问题已修复 (2026-01-13)
- 10-12-run-tests-collect-issues: done # 运行测试并收集问题和改进建议 ✅ 完成 (2026-01-13) - 发现4个问题,工具扩展需求少于3个
- 10-13-extend-utils-if-needed: n/a # 扩展工具包(如需要)⏭️ 跳过 - 工具扩展需求评估结果:无需扩展,直接进入 Story 10.14
- 10-14-order-stability-test: done # 订单管理稳定性验证 ✅ 完成 (2026-01-13) - 稳定性测试完成,成功率 97.9%,问题已修复
- epic-10-retrospective: done # 回顾完成于 2026-01-13,文档: epic-10-retrospective-2026-01-13.md
- # Epic 11: 基础配置管理测试 (Epic F - 业务测试 Epic)
- # 目标: 为平台、公司、渠道配置管理编写 E2E 测试
- # 业务分组: Epic F(基础配置管理测试)
- # 范围: Platform、Company、Channel 的创建和验证
- # 背景: Platform 和 Company 是订单创建和企业用户的必要前置条件
- # 优先级: HIGH - 阻塞 Epic D(用户管理)和 Epic E(跨端同步)
- # 实体关系: Platform (1:N) Company (1:N) Order
- # 回顾文档: _bmad-output/implementation-artifacts/epic-11-retrospective-2026-01-13.md
- epic-11: done
- 11-1-platform-page-object: done # Platform 管理 Page Object ✅ 完成(代码审查完成,所有HIGH和MEDIUM问题已修复)
- 11-2-platform-create-test: done # 创建测试平台 ✅ 10 passed (33.6s) - 已修复删除超时和网络监听问题 (2026-01-12)
- 11-3-platform-list-test: done # 验证平台列表显示 - 代码审查完成,所有 HIGH 和 MEDIUM 问题已修复
- 11-4-company-page-object: done # Company 管理 Page Object(重点) - 代码审查完成,所有 HIGH 和 MEDIUM 问题已修复
- 11-5-company-create-test: done # 创建测试公司(需要先有平台) - 17/17 测试通过 (2026-01-12) - 代码审查完成 (2026-01-13)
- 11-6-company-list-test: done # 验证公司列表显示 ✅ 14 个测试全部通过,代码审查完成,所有 HIGH 和 MEDIUM 问题已修复 (2026-01-12)
- 11-7-channel-page-object: done # Channel 管理 Page Object(可选)
- 11-8-channel-create-test: done # 创建测试渠道(可选) - ✅ 11/11 测试通过 (2.9m) (2026-01-13)
- 11-9-config-validation-test: done # 验证订单可以选择平台和公司 - 清理策略测试通过 (2026-01-13)
- epic-11-retrospective: done # 回顾完成于 2026-01-13
- # Epic 12: 用户管理与小程序登录测试 (Epic D - 业务测试 Epic)
- # 目标: 为用户管理和小程序登录编写 E2E 测试
- # 业务分组: Epic D(用户管理与小程序登录)
- # 范围: 后台创建企业/人才用户、小程序登录测试
- # 背景: 小程序登录是跨端测试的前置条件
- # 依赖: Epic 11 完成(需要 Company 数据)
- # 技术要点: 小程序通过 H5 URL 访问,使用 Playwright 测试
- epic-12: done
- 12-1-user-page-object: done # 用户管理 Page Object ✅ 代码审查问题全部修复完成 (2026-01-13)
- 12-2-create-employer-user: done # 后台创建企业用户测试 - 13 passed, 2 skipped (2026-01-13)
- 12-3-create-talent-user: done # 后台创建人才用户测试 - 14 passed, 2 skipped (2026-01-13)
- 12-4-enterprise-mini-page-object: done # 企业小程序 Page Object ✅ 完成 (2026-01-13)
- 12-5-enterprise-mini-login: done # 企业小程序登录测试 ✅ 完成 (2026-01-14) - 包含退出登录 Bug 修复
- 12-6-talent-mini-page-object: done # 人才小程序 Page Object ✅ 完成 (2026-01-14) - 两轮代码审查问题全部修复
- 12-7-talent-mini-login: done # 人才小程序登录测试 ✅ 完成 (2026-01-14) - 8/16 测试通过,已知问题已记录
- 12-8-user-permission-test: n/a # 用户权限验证(小程序无写操作)⏭️ 已跳过 - Epic 12 核心目标已完成,这是可选的安全验证测试,Playwright MCP 可支持手动验证
- epic-12-retrospective: optional
- # Epic 13: 跨端数据同步测试 (Epic E - 业务测试 Epic)
- # 目标: 验证后台操作后小程序端的数据同步
- # 业务分组: Epic E(跨端数据同步测试)
- # 范围: 后台 CRUD → 小程序显示验证
- # 背景: 真实用户旅程跨越多个端,需要验证数据同步
- # 依赖: Epic 10(订单管理)和 Epic 12(小程序登录)完成
- # 技术要点: 多 Page 对象管理、Playwright MCP 优先测试流程
- # 测试流程: EXPLORE(任务 0)→ RED(任务 1-3)→ GREEN(任务 4-5)→ REFACTOR(任务 6)
- epic-13: in-progress
- 13-1-order-create-sync: removed # 已删除 - 功能被 Story 13.8 完全覆盖 (2026-01-15)
- 13-2-order-edit-sync: removed # 已删除 - 功能被 Story 13.8 完全覆盖 (2026-01-15)
- 13-3-person-add-sync: done # 后台添加人员 → 人才小程序验证 ✅ 完成 (2026-01-15) - Playwright MCP 验证完成,后台功能全部正常
- 13-4-status-update-sync: done # 后台更新状态 → 双小程序验证 ✅ 完成 (2026-01-15) - 后台状态更新、企业小程序验证测试通过,人才小程序登录修复,代码已提交 (4e85d06d)
- 13-5-cross-platform-stability: done # 跨端测试稳定性验证 ✅ 完成 (2026-01-15) - 重构完成,所有测试通过(19/19),类型检查通过
- 13-6-dashboard-sync: done # 首页看板数据联动专项测试 ✅ 完成 (2026-01-14) - 所有4个测试通过
- 13-7-dashboard-navigation: done # 首页导航和交互测试 - 测试快捷操作按钮、查看全部链接、人才卡片点击 ✅ 完成 (2026-01-15) - 13/13 测试通过,所有代码审查问题已修复
- 13-8-order-list-validation: done # 订单列表页完整验证(2026-01-14 新增)- 验证订单列表页所有功能:筛选、搜索、分页、字段显示、交互 ✅ 完成 (2026-01-15)
- 13-9-talent-list-validation: done # 人才列表页完整验证(2026-01-14 新增)- 验证人才列表页所有功能:筛选、搜索、分页、字段显示、交互 ✅ 完成 (2026-01-14) - 代码审查完成,MEDIUM 优先级问题已修复并提交 (88222f28)
- 13-10-talent-detail-validation: done # 人才详情页完整性验证 ✅ 完成 (2026-01-15) - 代码审查完成,所有问题已修复
- 13-11-order-detail-validation: done # 订单详情页完整性验证 ✅ 完成 (2026-01-15) - 代码审查完成,所有问题已修复,测试通过 (2026-01-15)
- 13-12-statistics-page-validation: done # 数据统计页测试与功能修复(2026-01-15 完成)- Page Object 已实现,E2E 测试已创建(25 个测试用例)
- 13-13-order-stats-fix: done # 订单统计字段显示修复(企业小程序)- ✅ 完成 (2026-01-15) - 后端 API + 前端修复 + E2E 测试
- 13-14-order-detail-stats-fix: review # 订单详情页统计数据修复(企业小程序)- ✅ 完成 (2026-01-16) - 修复详情页与列表页数据不一致问题
- 13-15-mini-ui-simplification: done # 企业小程序 UI 简化 - 删除写操作按钮(2026-01-16 新增)- ✅ 完成 - 已删除所有写操作按钮,E2E 测试已创建
- epic-13-retrospective: optional
- # Epic 组织架构 (2026-01-13):
- # =========================
- # Epic A: 残疾人管理 E2E 测试 ✅ 完成
- # - Epic 1: 测试工具包基础框架与 Select 支持 ✅
- # - Epic 2: 在现有 E2E 测试中验证 Select 工具 ✅
- # - Epic 3: 文件上传工具开发与验证 ✅
- # - Epic 9: 残疾人管理完整 E2E 测试覆盖(含并行隔离)✅
- #
- # Epic B: 区域管理 E2E 测试 ✅ 完成
- # - Epic 8: 区域管理 E2E 测试 ✅
- #
- # Epic C: 订单管理 E2E 测试 ✅ 完成
- # - Epic 10: 订单管理 E2E 测试 ✅ (14/14 Stories done) - 稳定性 97.9%
- #
- # Epic D: 用户管理与小程序登录测试 🔄 进行中
- # - Epic 12: 用户管理与小程序登录测试 (5/8 Stories done)
- #
- # Epic E: 跨端数据同步测试 🆕 新增
- # - Epic 13: 跨端数据同步测试 (0/5 Stories)
- #
- # Epic F: 基础配置管理测试 ✅ 完成
- # - Epic 11: 基础配置管理测试 (9/9 Stories done)
- #
- # Epic G: e2e-test-utils 包维护 🌟 支持性任务
- # - Epic 4: 表单工具开发与验证 ⏭️ 已跳过 (2026-01-16)
- # - Epic 5: 列表和对话框工具开发与验证 ⏭️ 已跳过 (2026-01-16)
- # - Epic 6: 完整验证 ⏭️ 已跳过 (2026-01-16) - 已合并到 Epic 9
- # - Epic 7: 文档与开发者体验 ⏭️ 已跳过 (2026-01-16)
- #
- # Epic 依赖关系:
- # =========================
- # Epic 11 (配置管理) → Epic 12 (用户管理) → Epic 13 (跨端同步)
- # Epic 10 (订单管理) → Epic 13 (跨端同步)
- #
- # 新 PRD 方向(2026-01-12 修订):
- # - 业务测试优先(主目标)
- # - 工具自然演进(副目标)
- # - 扩展覆盖:管理后台 + 小程序(Epic D/E/F)
- # - Epic 优先级建议:
- # Phase 1: Epic B(简单)→ Epic C(复杂核心业务)
- # Phase 2: Epic F(配置管理)→ Epic D(用户管理)→ Epic E(跨端同步)
- # 技术改进完成状态 (2026-01-10):
- # ================================
- # - HIGH: 配置 ESLint 规则捕获常见问题 ✅
- # - HIGH: 更新架构文档记录 TypeScript + Playwright 陷阱 ✅
- # - HIGH: 创建开发者自查清单 ✅
- # 详情参见:
- # - packages/e2e-test-utils/eslint.config.js
- # - _bmad-output/planning-artifacts/architecture.md (新增 TypeScript+Playwright 陷阱部分)
- # - packages/e2e-test-utils/docs/DEVELOPER_CHECKLIST.md
|